Advanced Planning and Scheduling Software for Manufacturing

Cantier APS

Close the gap between the planning office and the shop floor.

Demand planning and forecasting, S&OP consensus planning, supply planning and MRP, order promising, production planning, finite scheduling, constraint management, and scenario-based optimization and replanning.

  • Demand planning
  • S&OP
  • Supply planning & MRP
  • Finite scheduling
  • Constraint management
The challenges

Planning that can't see the shop floor

Four gaps keep the plan and the plant apart.

  1. 01

    Planning runs in spreadsheets

    Demand, supply and scheduling sit outside the systems that record what the floor actually did.

  2. 02

    Infinite-capacity assumptions

    Schedules ignore the machine, labour, tooling and material limits the plant works under.

  3. 03

    Order dates are guesses

    Promising a delivery date means checking with production rather than the plan.

  4. 04

    Replanning takes too long

    A disruption on the floor takes hours to work back through the schedule.

All four close when planning and execution share one platform.

The solution

Cantier APS

Cantier's advantage in planning and scheduling is architectural: because APS is designed on the same platform as MES, QMS and CMMS, a schedule can be built against real material, capacity and quality constraints instead of the static assumptions most standalone planning tools rely on.

  • Reduce planning-to-execution lag by connecting demand, supply and scheduling to real shop-floor data instead of spreadsheets.
  • Give planners order-promising answers (ATP/CTP) grounded in real material and capacity constraints.
  • Replace infinite-capacity approximations with finite-capacity, constraint-aware scheduling.
Cantier job orders list with planned and actual start and completion dates
Feature highlights

From demand signal to a schedule the floor can run

Plan & promise

Operator monitoring production dashboards at a machine control station

Demand Planning

Converts forecasts, customer orders and demand signals into structured requirements — statistical forecasting, version management and customer/product-level detail, with collaboration, adjustment/approval and consumption against sales orders.

S&OP Consensus Planning

Reconciles demand and supply into a single consensus plan — balancing capacity against demand, aligning financial and operational plans, and comparing scenarios through an executive review and approval cycle.

Supply Planning & MRP

Runs material requirements planning, inventory and safety-stock planning, and purchase/production requirements planning, with material pegging, shortage identification and replenishment feeding planned-order generation.

Order Promising

Gives available-to-promise and capable-to-promise answers, with delivery-date simulation, order prioritization and soft/hard allocation against customer orders.

Schedule & optimize

Engineers reviewing a robotic assembly line with a tablet

Production Planning

Runs master production scheduling, rough-cut and detailed capacity requirements planning, and material/capacity balancing across make-to-stock, make-to-order and engineer-to-order modes.

Finite Scheduling

Generates finite-capacity, constraint-based schedules with drag-and-drop Gantt editing, configurable dispatch rules and setup/changeover optimization.

Constraint Management

Identifies and manages machine, labour, material, tooling and storage/buffer constraints, including bottleneck identification and drum-buffer-rope management.

Optimization & Replanning

Runs what-if scenario simulation and schedule comparison, bottleneck and constraint analysis, and schedule optimization, with real-time rescheduling for disruptions.

Manufacturing X.0 intelligent offering

APS X.0

The three shared platform pillars are intended to add real-time operational context, planning intelligence, the Planning Co-Pilot and governed planning agents.

Shared platform pillars

  • Cantier IntelliFabricReal-time operational context
  • Cantier Operational Digital TwinPlanning intelligence
  • Cantier.aiPlanning Co-Pilot & governed agents
Cantier APSAdvanced planning and scheduling
FAQ

Answers to common questions about Cantier APS

01What is Cantier APS for manufacturing?

Cantier APS is advanced planning and scheduling software for manufacturing that connects demand planning, supply planning, MRP, production planning, finite scheduling, and real-time replanning. As part of the Manufacturing X.0 platform, it connects planning with real shop-floor constraints.

02How does Cantier APS connect production planning with shop-floor execution?

Cantier APS connects planning with MES, QMS, and CMMS on the same Manufacturing X.0 platform. This allows schedules to be built using real material, capacity, and quality constraints rather than static planning assumptions.

03Does Cantier APS support demand planning and forecasting?

Yes. Cantier APS supports demand planning and statistical forecasting, using forecasts, customer orders, and demand signals to create structured requirements. Planners can manage forecast versions, collaborate on adjustments, approve plans, and consume demand against sales orders.

04What is S&OP consensus planning in Cantier APS?

S&OP consensus planning in Cantier APS aligns demand, supply, capacity, financial plans, and operational plans into a single consensus plan. Planners and executives can compare scenarios and move through a structured review and approval process.

05Does Cantier APS support MRP and supply planning?

Yes. Cantier APS supports material requirements planning (MRP), inventory and safety-stock planning, and purchase and production requirements planning. Material pegging and shortage identification help planners determine replenishment requirements and generate planned orders.

06Does Cantier APS support ATP and CTP order promising?

Yes. Cantier APS supports Available-to-Promise (ATP) and Capable-to-Promise (CTP) to help manufacturers provide realistic delivery commitments. It supports delivery-date simulation, order prioritization, and soft or hard allocation against customer orders.

07Does Cantier APS support finite-capacity scheduling and constraint management?

Yes. Cantier APS provides finite-capacity, constraint-based scheduling across machine, labor, material, tooling, and storage or buffer constraints. Planners can use drag-and-drop Gantt scheduling, configurable dispatch rules, setup/changeover optimization, and bottleneck identification.

08Can Cantier APS optimize schedules and handle production disruptions?

Yes. Cantier APS supports what-if scenario simulation, schedule comparison, bottleneck analysis, and schedule optimization. When production conditions change, planners can perform real-time replanning and rescheduling to respond to disruptions and changing constraints.

Get started

Plan smarter. Schedule with real manufacturing constraints.

Explore Cantier APS and its advanced planning and scheduling capabilities within the Manufacturing X.0 platform.

Request a Demo

Prefer email? Write to contact.sg@cantier.com

  • Finite, constraint-based scheduling
  • ATP and CTP order promising
  • Scenario simulation and rescheduling