Production Planning & Scheduling

Turn orders into an executable, constraint-aware schedule. Cantier plans across materials, machines, labour and tooling — then keeps the shop floor in sync as reality changes, minute by minute.

Finite-capacity APSMRP + CRPReal-time rescheduleDrag-and-drop Gantt

The challenge

Spreadsheets can’t keep up with a live shop floor

A static plan breaks the moment a machine goes down, a rush order lands, or material slips. Planners lose hours firefighting in Excel while the floor runs on instructions that are already out of date.

!

Plans go stale instantly

By the time a schedule is published, the floor has already moved on.

~

Capacity is guesswork

Infinite-capacity planning over-promises due dates you cannot actually hit.

R

Replanning is painful

Every disruption means manual rework across disconnected spreadsheets.

Capabilities

Everything you need to plan and schedule with confidence

FC

Finite-Capacity Scheduling

Schedule against real machine, labour and tooling capacity — no more infinite-capacity fantasy plans.

MR

MRP & CRP

Net material requirements and capacity planning generated from live BOMs, routings and on-hand inventory.

GA

Drag-and-Drop Gantt

An interactive scheduling board — reorder, split and reassign jobs in seconds and see the impact instantly.

RT

Real-Time Rescheduling

Breakdowns, rush orders and material delays automatically trigger an optimized re-plan.

RU

Constraint & Rule Engine

Sequence-dependent setups, shift calendars, changeover and priority rules applied automatically.

WI

What-If Scenarios

Simulate due-date, capacity and sequencing options before you commit to a plan.

How it works

From demand signal to dispatched job

STEP 01

Ingest demand

Orders, forecasts and priorities flow in from ERP and MES in real time.

STEP 02

Plan & optimize

The APS engine builds a finite-capacity schedule against your constraints.

STEP 03

Release to floor

Dispatch lists and digital work instructions reach the right stations.

STEP 04

Sense & re-plan

Live machine and WIP signals trigger automatic rescheduling.

How production planning and scheduling works with Cantier Manufacturing X.0

Outcomes

What disciplined scheduling delivers

30–50%
Less planning effort
98%+
On-time delivery achievable
Minutes
To re-plan after a disruption
+15%
Typical throughput gain

One platform

Works with the rest of Manufacturing X.0

Planning & Scheduling shares one live data model with the rest of Cantier — so the schedule reflects real WIP, inventory and machine status, not a nightly batch.

→

WIP Traceability & Genealogy

Schedules reflect exactly where every job really is on the floor.

→

Inventory & Material Flow

Plans honour real material availability and replenishment timing.

→

Control Tower Dashboards

Planners and managers see plan-vs-actual live, in one view.

Features & capabilities

Inside planning & factory setup

Scheduling runs on a rich factory model — your factories, capacity and routes — turned into live, resourced job orders and plans.

Factory & Capacity Setup — Master

The factory model your schedule plans against.

  • ›Factories
  • ›Shifts
  • ›Work Centers
  • ›Skills
  • ›Skillsets
  • ›Tool Groups
  • ›Tools
  • ›Equipment Groups
  • ›Equipment
  • ›Equipment Priority
  • ›Processes
  • ›Production Lines
  • ›Manufacturing Unit

Planning & Job Orders — WIP

Turn demand into executable, resourced jobs.

  • ›Job Orders
  • ›Production Planning
  • ›Manpower Assignment
  • ›RM Availability Dashboard

See Cantier schedule your factory

Book a walkthrough with our manufacturing team and watch a live, finite-capacity plan come together against your real constraints.